Thursday, September 26, 2013

Raise the Roof!!!

We have a partial roof and framing is almost done! So, excited to see the progress. Shingles and windows should be in by next week. After that, we have a few inspections and then DRYWALL!!!



Friday, September 13, 2013

Framing Has Begun!

Hello All!!! I know its been awhile since I've posted...approximately 6 weeks! Well, to be quite honest, I didn't think there was much to share until today! The basement and garage are partially framed. By Monday the first floor should be framed and by the end of the week the second floor should be done! We are hoping for a roof within the next 2 weeks!

View of side load garage, driveway and front yard.
Veiw of front yard and garage.

Veiw from inside of garage. 3 windows look out onto the front yard.

Laundry/mudroom and kitchen. 

First floor living entryway and living room.
Basement all framed up with 3 full windows and a large patio door.
The rest of the basement and the morning room above. 

This is going to be a massive basement!! Just in time for a Superbowl party!
Building the staircase from the first floor to the basement.
Full bath and hallway in the basement.
Bathroom.
Media Room in basement.

Backyard view.